Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Search representations
Results for Environment Agency (Statutory / General Consultation Body) search
New searchObject
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Chapter 8: Climate Change - Our sustainable and resilient future
Representation ID: 864
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Detailed comments in representation tables to be referenced - The sustainability appraisal’s reasonable‑alternatives document and monitoring framework are outdated and do not incorporate the latest housing targets, climate‑change allowances or combined‑sewer considerations; updated testing for climate change (Test 1) and water‑resource impacts (Test 2) is required.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Strategic Policy WS: Waste spatial strategy
Representation ID: 3058
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Overall the EA supports the Plan’s waste strategy, it covers everything we would expect and has anticipated
issues which may arise over the plan period and how these can be managed.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Policy W2: Waste reduction and waste audit for major and significant waste generating developments
Representation ID: 3059
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Bullet 1 'retain and repurpose existing structures
where possible ' repeated in error
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Policy W2: Waste reduction and waste audit for major and significant waste generating developments
Representation ID: 3060
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Suggest the explanation ends with ‘Waste permits will also need to be secured where applicable’
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Policy W4: Proposals for new waste management facilities
Representation ID: 3061
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Para 2 - This is a long sentence with lots of brackets, some open without closing. Suggest reworded.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Policy W4: Proposals for new waste management facilities
Representation ID: 3062
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Last sentence - Change to ‘Provision for restoration and after use will be required’. Restoration is always required.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Strategic Policy W5: Waste water disposal and infrastructure capacity
Representation ID: 3063
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
This policy is supported but feels like it should sit or be echoed in the housing or infrastructure sections of the Plan
rather than the waste and minerals section.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Strategic Policy W5: Waste water disposal and infrastructure capacity
Representation ID: 3064
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
12.12 - Not clear when this is ‘appropriate’ this should be the exception. Explanation of natural system, we don’t support private works as a general rule.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Strategic Policy MS: Sustainable minerals strategy
Representation ID: 3065
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Last sentence - Please amend 'should' to 'must be restored'
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Policy M1: Minerals extraction and environmental safeguards
Representation ID: 3066
Received: 12/02/2026
Respondent: Environment Agency (Statutory / General Consultation Body)
Last sentence - An acceptable programme of progressive
working throughout its life, early restoration and after-use
should be submitted