Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Search representations

Results for Environment Agency (Statutory / General Consultation Body) search

New search New search

Object

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Chapter 8: Climate Change - Our sustainable and resilient future

Representation ID: 864

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Detailed comments in representation tables to be referenced - The sustainability appraisal’s reasonable‑alternatives document and monitoring framework are outdated and do not incorporate the latest housing targets, climate‑change allowances or combined‑sewer considerations; updated testing for climate change (Test 1) and water‑resource impacts (Test 2) is required.

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Strategic Policy WS: Waste spatial strategy

Representation ID: 3058

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Overall the EA supports the Plan’s waste strategy, it covers everything we would expect and has anticipated
issues which may arise over the plan period and how these can be managed.

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Policy W2: Waste reduction and waste audit for major and significant waste generating developments

Representation ID: 3059

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Bullet 1 'retain and repurpose existing structures
where possible ' repeated in error

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Policy W2: Waste reduction and waste audit for major and significant waste generating developments

Representation ID: 3060

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Suggest the explanation ends with ‘Waste permits will also need to be secured where applicable’

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Policy W4: Proposals for new waste management facilities

Representation ID: 3061

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Para 2 - This is a long sentence with lots of brackets, some open without closing. Suggest reworded.

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Policy W4: Proposals for new waste management facilities

Representation ID: 3062

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Last sentence - Change to ‘Provision for restoration and after use will be required’. Restoration is always required.

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Strategic Policy W5: Waste water disposal and infrastructure capacity

Representation ID: 3063

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

This policy is supported but feels like it should sit or be echoed in the housing or infrastructure sections of the Plan
rather than the waste and minerals section.

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Strategic Policy W5: Waste water disposal and infrastructure capacity

Representation ID: 3064

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

12.12 - Not clear when this is ‘appropriate’ this should be the exception. Explanation of natural system, we don’t support private works as a general rule.

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Strategic Policy MS: Sustainable minerals strategy

Representation ID: 3065

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Last sentence - Please amend 'should' to 'must be restored'

Attachments:

Support

Regulation 18 Draft Local Plan 2025 Online Version and Consultation

Policy M1: Minerals extraction and environmental safeguards

Representation ID: 3066

Received: 12/02/2026

Respondent: Environment Agency (Statutory / General Consultation Body)

Representation Summary:

Last sentence - An acceptable programme of progressive
working throughout its life, early restoration and after-use
should be submitted

Attachments:

For instructions on how to use the system and make comments, please see our help guide.