Chapter 7: Building for the future - Resilient and smart infrastructure and developer contributions
Representation ID: 882
Received: 16/01/2026
Respondent: National Grid Electricity Distribution (South West) Plc (Statutory / General Consultation Body)
LPAs should respond each year to NGED’s DFES questionnaire so the electricity network forecasts reflect current growth ambitions.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Chapter 7: Building for the future - Resilient and smart infrastructure and developer contributions
Representation ID: 883
Received: 16/01/2026
Respondent: National Grid Electricity Distribution (South West) Plc (Statutory / General Consultation Body)
For developments needing a connection within five years, the LPA should arrange an early ‘connections surgery’ with NGED to clarify timescales and costs.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Chapter 7: Building for the future - Resilient and smart infrastructure and developer contributions
Representation ID: 884
Received: 16/01/2026
Respondent: National Grid Electricity Distribution (South West) Plc (Statutory / General Consultation Body)
Allocation policies should give priority to retaining high‑voltage overhead lines where feasible, embedding design principles that sensitively incorporate the lines and exploit the space beneath for green infrastructure, thereby reducing embodied carbon.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Chapter 7: Building for the future - Resilient and smart infrastructure and developer contributions
Representation ID: 885
Received: 16/01/2026
Respondent: National Grid Electricity Distribution (South West) Plc (Statutory / General Consultation Body)
Where diversion or undergrounding of overhead lines is required, the LPA must engage with NGED early to assess viability and ensure allocation‑policy wording reflects agreed solutions.
Support
Regulation 18 Draft Local Plan 2025 Online Version and Consultation
Chapter 7: Building for the future - Resilient and smart infrastructure and developer contributions
Representation ID: 886
Received: 16/01/2026
Respondent: National Grid Electricity Distribution (South West) Plc (Statutory / General Consultation Body)
Strategic sites with multiple pylons should be supported by early master‑planning and supplementary planning documents that set out capacity, retention/diversion principles and land for new substations.